Memorial Baptist Church
Greenville, NC

We have been working with Memorial Baptist Church for years, one phase at a time with an overall outlook of the eventual big picture. Each phase conquered a new task and made way for the next phase.

Phase 1
Upgraded Memorial's audio system with a main focus on adding a new speaker cluster.

Phase 2
Upgraded a very old lighting system dimmer by installing all new AMX architectural dimmers without having to redo the entire lighting system, thus saving money.

We were able to use existing conduit and wiring with minimal modifications. AMX dimming allowed us to do unique programming to suit the unique church environment.

Renovation of all the church lighting including both the architectural lighting and TV lighting, at the same time pre-wiring for future TV capabilities.

Phase 3
Adding the TV system using remote pan/tilt cameras set up in a 4 camera system with computer graphics. We set up a TV control room in the balcony with the audio system.

Phase 4
Replacing of multimedia projector and screen.

Phase 5
Upgraded audio system in fellowship hall.